[ad_1]
TASHKENT, Uzbekistan, July 15. Saudi Arabia’s
ACWA Energy plans to assemble inexperienced hydrogen plant with the entire
capability of three,000 tons per 12 months in Uzbekistan, Development stories.
An settlement was reached through the assembly between Minister of
Investments, Business, and Commerce of Uzbekistan Laziz Kudratov and
Chairman of ACWA Energy Mohammad Abunayyan.
The development work is deliberate to start within the autumn of
the present 12 months.
The perimeters exchanged views on the implementation of ongoing
tasks, together with the development of a combined-cycle energy
plant with a capability of 1.5 GW within the Syrdarya area, wind energy
vegetation with a complete capability of two.6 GW within the Bukhara area and
the Republic of Karakalpakstan, and solar energy stations with a
capability of 1.4 GW within the Samarkand and Tashkent areas. An
settlement was reached to take a complete set of sensible
measures to speed up the commissioning of those tasks.
Moreover, the prospects for accelerating the localization
venture for the manufacturing of wind turbine gear have been explored.
In keeping with either side, the implementation of this venture in
Uzbekistan will considerably develop the geography and scale of
renewable power utilization and improve the provision of those
applied sciences within the home market.
Because of the negotiations, the events agreed to take
focused measures inside the framework of well timed and profitable
implementation of the mentioned tasks and initiatives.
In the meantime, earlier this 12 months, Saudi Arabia’s ACWA Energy has
signed an settlement on the event of a $88 million value inexperienced
hydrogen venture in Uzbekistan. At the moment, the corporate’s funding
portfolio in Uzbekistan contains 8 tasks with a complete worth
exceeding $6.8 billion and a projected capability of over 5.5 GW.
[ad_2]
Source link